The only purpose made sheet pile capping system available for concrete cap formwork, is faster and more cost effective than any on-site `lash ups’.
The Redeb bracket and Soffit panel cab be assembled and re-used by unskilled labour. Welding or cutting of piles is not necessary. It renders obsolete the use of individual plywood soffit panel formwork cut out to match pile pans.
Traditional `old fashioned’ methods use brackets welded against piles to carry longitudinal beams and shuttering timber. Such brackets have ultimately to be burned off, their stubs ground down and the piles paintwork made good. All this trouble is avoided using this pile capping system.