Realization of the 2 future bridge’s stacks of the new Angers tram line. Vibro driving with a 25M then backpile driving 2×4 tubes 1220 mm in diameter and 14 m long with the new pneumatic hammer PAJOT 4200C.
Then construction of the sheet pile cofferdam.